Our team will supply all required manpower, supporting materials, equipment, and professional tools to carry out the tile installation works. All tiles required for the installation will be supplied by the client.
The existing floor surface will first be inspected, cleaned, and prepared to ensure it is free from dust, debris, and loose particles. The surface will then be made ready for installation to achieve proper adhesion.
The tiles will be installed using Weber E-MIX Tile Fix 303, a high-performance cement-based tile adhesive that provides excellent bonding strength and long-lasting durability. Each tile will be carefully aligned and levelled to maintain consistent joint spacing, a professional finish, and an even floor surface.
For the Living Room, Kitchen, Common Room, and Master Bedroom, the tile replacement works will include the installation of the client-supplied tiles onto the prepared floor areas.
For the two toilet floors, the tile overlay method will be carried out by installing the new client-supplied tiles directly over the existing tiles using Weber E-MIX Tile Fix 303, provided the existing substrate is structurally sound and suitable for overlay.
Upon completion, the installed tiles will be checked for alignment, levelness, and bonding quality. The work area will be cleaned, and all excess adhesive and construction debris generated during the installation will be removed, leaving the site neat and ready for the next stage of work.