The client engaged TechPay Solutions to carry out renovation works for the bathroom floor and wall finishes, including the replacement of the existing water closet (WC), floor tile overlay, and wall tile refurbishment.
The project commenced with the careful removal and proper disposal of the existing WC to prepare the work area. A W1 Cement Strengthener was then applied to improve the bonding strength between the existing floor surface and the new tile overlay system. New floor tiles were installed using the appropriate materials and installation methods to achieve a durable, level, and aesthetically pleasing finish. Upon completion of the flooring works, a new water closet was supplied and installed, with the WC material value capped at S$250.
For the bathroom wall renovation, the existing shower screen and shower set were first dismantled and safely removed. The existing mosaic wall tiles were hacked off and disposed of, removing approximately 10–40mm of the wall surface where required. After the wall was cleaned and prepared, W1 Cement Strengthener was applied to enhance adhesion. Where necessary, the wall surface was restored with 10–15mm plastering to provide a smooth and even substrate for the new tiles.
The new wall tiles were installed using Weber E-MIX Tile Fix 303, ensuring strong adhesion and precise alignment. Once the tile installation was completed, AM50 Normal Tile Grout was applied to all tile joints to provide a neat appearance and long-lasting protection against moisture. Finally, the existing shower screen and shower set were carefully reinstalled, completing the bathroom renovation with a clean, modern, and fully functional finish.